top of page

Canal Muck Removal

This page will be updated regularly with the latest information on the proposed Special Assessment District (SAD) for the 130 properties, along the entire length of the Lakeshore/Archer/Pardee canals and the intersection between the north Lakeshore bridge and the old Pardee bridge. 

Petition

For the project to proceed the petition must be signed by 51% of the affected residents.  Click HERE to read the full petition.

Contact Ken Mulder, HPHA President with any questions or to sign.

istockphoto-1815149460-612x612.jpg

Project Proposal and Estimate

Click HERE to view the project SAD proposal that includes location maps for where the work will be completed as well as where the sedimentation bags will be placed.

Click HERE to view the estimate and project details from the contractor.

project_proposal.jpg

Test Results of Sediment

12 different locations in the canals were tested for toxins and the results showed that all were within acceptable ranges.  
Click HERE to view the lab report.

Click HERE to view the sample detections in the sediment.

test-results-red-rubber-stamp-over-white-background-87996846.jpg.webp
bottom of page